Friday, June 1, 2007

High and Lifted Up




The work here continues, and is very gratifying. I have been continuing with electrical work, and Melody has been doing some construction work herself, painting inside the new building. I took the day off today (Friday 6/1), and played golf with a friend from Eustus Florida. Since doing that, and the fact that our electrical Foreman is leaving on Monday, I said I would work on Saturday. The man in charge of the new building, is always taking pictures, and captured me. Theses give new meaning to the song High and Lifted Up. I was wiring and hanging the lights in the entry of this building, up about 30 feet or so. The weather has changed slightly, starting to rain, as June 1 starts Hurricane Season. They need rain badly down here. More later
Ken

No comments: